Projects and Grants per year
Grants and Contracts Details
Description
This project will conduct another phone poll during the late summer or early fall of 2015, focusing
on the same issues.
Status | Finished |
---|---|
Effective start/end date | 7/1/14 → 6/30/16 |
Funding
- KY Transportation Cabinet
Projects
- 1 Finished
-
SPR 2016 Prime
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Blandford, B. (CoI), Chen, M. (CoI), Gibson, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Harik, I. (CoI), Howell, B. (CoI), Kirk, A. (CoI), Kissick, J. (CoI), Kreis, S. (CoI), Martin, S. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Rister, B. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Spellman, M. (CoI), Stamatiadis, N. (CoI), Sturgill, R. (CoI), Sun, L. (CoI), Taylor, T. (CoI), VanDyke, C. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Agarwal, N. (Former CoI), Fields, M. (Former CoI), Hopwood, T. (Former CoI), Hunsucker, D. (Former CoI), McCormack, S. (Former CoI), O'Connell, L. (Former CoI) & Pigman, J. (Former CoI)
7/1/14 → 6/30/19
Project: Research project