Projects and Grants per year
Grants and Contracts Details
Description
Objective: To monitor the condition of selected highway infrastrncture projects which contain experimental/ test features, using onsite assessment techniques and remote digital data acquisition as requested by the Kentncky Department of Highways. Assessment may involve both destrnctive and non-destructive testing, field evaluation and review.
Background: The performance of many new techniques utilized on a variety of highway projects may not be realized during installation or even during the near-term after constrnction. Provisions are generally made for short-te1m evaluations of experimental/test featnres as a part of the project. However, provisions are not usually made for longer term evaluations. Evaluations, as conducted by this research project initiative, provide significant long-term performance information at relatively low cost. This project currently consists of 41 subtasks across a wide range of materials and constrnction techniques and only a portion of these subtasks arc evaluated in any given year.
Status | Finished |
---|---|
Effective start/end date | 7/1/18 → 6/30/19 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
SPR Prime 2019
Kreis, S., Ashurst, K., Baskette, R., Baskette, R., Blackden, C., Blandford, B., Chen, M., Clay-Young, P., Dadi, G., Erhardt, G., Gibson, J., Graves, R., Green, E., Harik, I., Howell, B., Kirk, A., Martin, S., Palle, S., Peiris, N., Scully, T., Souleyrette, R., Staats, E., Staats, W., Stamatiadis, N., Sun, L., VanDyke, C., Waddle, S., Wallace, C., Walton, J., Agent, K., Albright, N., Beckham, T., Crabtree, J., Hopwood, T., Kissick, J., Lewis, R., Pigman, J., Rister, B., Sturgill, R. & Taylor, T.
7/1/18 → 6/30/23
Project: Research project