Projects and Grants per year
Grants and Contracts Details
Description
The performance of many new techniques utilized on a variety of highway projects may not be realized during installation or even during the near term of a construction project. Provisions are generally made for short-term evaluations of experimental features; however, most formal studies or projects are frequently finalized in rather nominal time periods and no provisions are made for long-term evaluations. Long-term evaluations provide significant information at relatively nominal costs. This project currently consists of forty-one subtasks across a wide range of materials and construction techniques, only a portion of these subtasks are evaluated in any given year.
Status | Finished |
---|---|
Effective start/end date | 7/1/12 → 6/30/13 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
SPR 2013 Prime KTC
Crabtree, J. (PI), Agarwal, N. (CoI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Fisher, J. (CoI), Goodrum, P. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), O'Connell, L. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Pigman, J. (CoI), Ripy, J. (CoI), Rister, B. (CoI), Rose, J. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI), Wallace, C. (CoI) & Walton, J. (CoI)
7/1/12 → 6/30/13
Project: Research project