Projects and Grants per year
Grants and Contracts Details
Description
Frequently, Kentucky Transportation Center investigators are called upon to conduct impromptu investigations for the evaluation of materials’ performances, construction procedures, analyses of failures, and other related features of highway design, construction, and maintenance. These investigations vary in complexity and nature, depending upon the situation and information desired. The investigations serve as a means of providing a tentative solution or analysis for immediate problems. In some cases, a full-scale study may result from what initially began as an impromptu investigation
Status | Finished |
---|---|
Effective start/end date | 7/1/12 → 6/30/13 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
SPR 2013 Prime KTC
Crabtree, J., Agarwal, N., Agent, K., Ashurst, K., Chen, M., Fisher, J., Goodrum, P., Graves, R., Green, E., Grossardt, T., Harik, I., Hartman, D., Hopwood, T., Hunsucker, D., Kirk, A., Kreis, S., McCormack, S., O'Connell, L., Palle, S., Peiris, N., Pigman, J., Ripy, J., Rister, B., Rose, J., Scully, T., Souleyrette, R., Stamatiadis, N., Sun, L., Taylor, T., Wallace, C. & Walton, J.
7/1/12 → 6/30/13
Project: Research project