Grants and Contracts Details
Description
Abstract
This project aims to perform studies to examine the impacts of increased charging of a large
number of PEVS on one of TVA’s LPCs with different charging patterns. Potential problems such
as undervoltage and overloading will be identified. Potential solutions based on managed smart
charging schemes, voltage regulation, and network reconfiguration will be researched and
proposed for LPC and TVA''s consideration.
1
Status | Active |
---|---|
Effective start/end date | 5/1/23 → 12/31/24 |
Funding
- Tennessee Valley Authority: $100,000.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.