Under this KHIT pre-bid and pre-construction meetings would be recorded by taking audio tapes
and pre-bid bridge site inspections would be video taped. KTC researchers would prepare written
minutes of the pre-bid meetings in summary form (with verbatim transcriptions of all questions
and answers). Those would be submitted to KYTC officials for review within 2 working days.
The minutes would be revised as necessary and provided to KYTC officials for posting on the
KYTC web site (in coordination with KYTC Contract Procurement and Information technology
officials) for contractor review, commentary or corrections, and submittal of additional
contractor questions within a pre-determined period prior to the submittal of formal bids.
Thereafter, KTC personnel will also provide KYTC with the audio recordings of the meetings on
standard audio tape and video recordings of the bridge site inspections on CD/DVD discs. This
work will be performed on 25 projects designated by KYTC paint personnel. The cost of
recordings/minutes of pre-bid meetings and pre-construction meetings is approximately $900 and
$700 respectively (depending on location).
Status | Finished |
---|---|
Effective start/end date | 7/1/03 → 6/30/14 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.