Grants and Contracts Details
Description
The objectives of this study are:
(1) Calculate ITI, PTI, and percentage travel under congestion for freeways within the
TRIMARC coverage; and
(2) Explore potential correlation between ITI, PTI, percentage travel under congestion and
incident data (e.g., number of incidents, duration, severity, etc.).
These analyses will be performed for the years 2005-7 for each monitored segment and freeway
corridor as well as for the entire freeway system. In 2005, there were approximately thirty-nine
miles of freeway that are under the surveillance of ninety-two detector stations, including four
miles on 1-71, twenty-one miles on 1-64, seven miles on 1-65, and seven miles on 1-264.
Status | Finished |
---|---|
Effective start/end date | 8/1/09 → 6/30/10 |
Funding
- KY Transportation Cabinet: $30,000.00