Trigg County: Route: US 68/80 Phase III Mitigation (and Data Recovery in portions of 15TR1 Area C)

  • Ahler, Steven (PI)
  • Pollack, David (CoI)

Grants and Contracts Details

Description

The enclosed data recovery plan (Attachment 1) serves as a scope of work for conducting the proposed mitigation of portions of Area C at 15TR1. In addition, the information presented in it serves as a summary of the Phase 2 field work conducted at both Area B and Area C. Also included is a budget for conducting the Phase 3 mitigation, which includes field work, laboratory analyses, specialist analyses, report preparation, curation, and development of a public education component. Kentucky. The proposed work is restricted to the portion of Area C and 15TR1 that lies within the proposed new rightof- way and construction easements and which will be directly affected by the proposed highway construction work. We are prepared to complete the field work this fall, and the analyses, report, and public education component will follow sequentially.
StatusFinished
Effective start/end date9/23/146/30/16

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.