Projects and Grants per year
Grants and Contracts Details
Description
TASK I General Assessment:
KWRRI will continue to assess for CHS the following technical areas:
1. Surface and ground water flow systems at the PGDP.
2. The nature and extent of contamination at the PGDP that has the potential to impact public health.
3. PGDP ground water monitoring systems as related to remedial actions and public health assessment.
4. Technical review and comment on all sampling and analysis plans, feasibility studies, remedial designs, risk
assessments, treatability studies and innovative technology assessment.
5. Review and comment on all remedial project and activity related documents published and/or referenced by the 0<
and/or it's contractors.
6. Review and evaluate all Core and Core Project Team activities as related to remedial activities at PGDP.
TASK" Specific Tasks:
KWRRI will provide comments and responses on the review, evaluation, and assessment of reports, documents, and
work for PGDP including special projects and tasks assigned by the Radiation Health and Toxic Agents Branch. Repo
documents, and work to be reviewed and evaluated are individual studies performed by the DOE and/or its contractor~
related to items outlined in the Summary of Major Deliverables for the PGDP presented above.
All task time lines are delineated by the DOE and not by CHS staff. Task activity will be assigned with a date of receip
KWRRI and a due date to CHS. The Radiation Health and Toxic Agents Branch, Chemist IV does not have control OVI
time lines for all PGDP environmental activities and all tasks shall be submitted on the schedules established by the 01
where applicable. At the time of task assignment the level of analysis will also be determined by the KWRRI project
coordinator in order to meet DOE time lines.
Status | Finished |
---|---|
Effective start/end date | 7/1/07 → 6/30/08 |
Funding
- KY Health Services Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished