Projects and Grants per year
Grants and Contracts Details
Description
OB.TECTIVES: The objectives oflhe project are to: I) Test the application of using ground
penetrating radar (GPR) for rapid inspection of bridge decks to detect areas of deterioration for future
rehabilitation; 2) Test different antennas to determine best frequency for bridge deck inspection; 3)
Develop standard testing practices for bridge deck inspection using GPR; 4) Develop standard
specifications outlining the anticipated tolerances and acceptance leve ls produced by GPR results;
and 5) Compare GPR's ability to determine concrete cover over steel reinforcement for acceptance
testing of new concrete. overl ays to th at of the pachometer.
Status | Finished |
---|---|
Effective start/end date | 7/1/10 → 6/30/11 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 11-31
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Fisher, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Stamatiadis, N. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/10 → 6/30/11
Project: Research project