N2 - Five long highways are under construction in Greece which will significantly update the country's infrastructure when completed. One of these highways is the Ionia Odos, located in the western part of the country. The focus of this paper is the technical presentation a) of the reasons of instability of a stiff - fissured clay cut with a height of 30-35m and b) an innovative solution for the remediation of the problem and permanent support of the cut. During the excavation of the initial part of the cut and after heavy rainfall, superficial slides occurred. The initial remediation plan proposed to reduce the slope inclination. This proposal could not materialize due to expropriation limits and long litigations with the owner of the adjacent property. An innovative solution with a geosynthetically reinforced slope was proposed which utilized the available space, allowed for steep short term excavation and provided a permanent retaining structure for the cut.
AB - Five long highways are under construction in Greece which will significantly update the country's infrastructure when completed. One of these highways is the Ionia Odos, located in the western part of the country. The focus of this paper is the technical presentation a) of the reasons of instability of a stiff - fissured clay cut with a height of 30-35m and b) an innovative solution for the remediation of the problem and permanent support of the cut. During the excavation of the initial part of the cut and after heavy rainfall, superficial slides occurred. The initial remediation plan proposed to reduce the slope inclination. This proposal could not materialize due to expropriation limits and long litigations with the owner of the adjacent property. An innovative solution with a geosynthetically reinforced slope was proposed which utilized the available space, allowed for steep short term excavation and provided a permanent retaining structure for the cut.
UR - http://www.scopus.com/inward/record.url?scp=84888320038&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84888320038&partnerID=8YFLogxK
U2 - 10.1061/9780784412121.047
DO - 10.1061/9780784412121.047
M3 - Conference contribution
AN - SCOPUS:84888320038
SN - 9780784412121
T3 - Geotechnical Special Publication
SP - 451
EP - 460
BT - GeoCongress 2012
T2 - GeoCongress 2012: State of the Art and Practice in Geotechnical Engineering
Y2 - 25 March 2012 through 29 March 2012
ER -