Abstract
Due to safety-imposed constraints on clearances for mobile bulk handling equipment, it is necessary to optimally select a unit based on speed and size. A simple graphical procedure and a calculus-based solution are presented to accomplish this. While the procedure applies to all mobile bulk handlers, as an example of the solution technique attention is focused on shuttle cars.
| Original language | English |
|---|---|
| Pages | 1238-1240 |
| Number of pages | 3 |
| Volume | 37 |
| No | 10 |
| Specialist publication | Mining Engineering |
| State | Published - Oct 1985 |
ASJC Scopus subject areas
- Geotechnical Engineering and Engineering Geology