Problem Statement
Severe cracks exist at the ends of the prestressed concrete I-girders on the 1-65 Bridges over Jacob,
Broadway, and Gray Street in Louisville (Jefferson County). The cracks have widened since they
were first identified. Carbon Fiber Reinforced Polymer (CFRP) fabric will be used to
strengthen/repair the cracks in the girders. Application ofthe CFRP fabric will provide additional
load carrying capacity that is evidently needed in view ofthe continued growth ofthe cracks. These
bridges are located on a major interstate, and replacement is not an option at this time.
Consequently, repair and strengthening is the only option.
III. Objectives
The objectives of this research are:
(1) Evaluate, design, and retrofit the prestressed concrete I-girders on the 1-65 Bridges over
Jacob, Broadway, and Gray Street in Louisville (Jefferson County).
(2) Monitor and evaluate the performance of the retrofit for three years.
| Estado | Finalizado |
|---|---|
| Fecha de inicio/Fecha fin | 11/1/03 → 12/31/11 |
Financiación
- KY Transportation Cabinet: 445.000,00 US$
Huella digital
Explore los temas de investigación que se abordan en este proyecto. Estas etiquetas se generan con base en las adjudicaciones/concesiones subyacentes. Juntos, forma una huella digital única.
Proyectos
- 1 Terminado
-
Carbon Fiber Reinforced Polymer Bonded Repair of I-65 Bridges in Louisville--Federal Aid Research Task No. 126
Graves, R. (PI), Harik, I. (CoI) & Toussaint, P. (CoI)
9/1/06 → 12/31/09
Proyecto: Research project