!!Projects per year
Detalles del proyecto
Description
As part of the overall public involvement strategy, and at the request of the KyTC, the
University of Kentucky Transportation Center (UKTC) proposes to provide targeted
public involvement support to several of the contractors on the project. These contractors
include, but are not necessarily limited to: Lochner and Associates; Michael Baker
Associates; and Parsons Brinckerhoff. This support will be in the general form of
helping design and deliver specific portions of the public involvement process, so as to
provide useful and timely information to the respective design teams, and also to bolster
the overall quality of the involvement on the part of the various advisory panels that are
designed into the strategy. This will entail working closely with the design and public
involvement specialists of the various contractors to ensure that UKTC can provide the
most efficient and useful support possible. The employment ofUKTC's Structured
Public Involvement protocol is anticipated as a part of this overall approach.
| Estado | Finalizado |
|---|---|
| Fecha de inicio/Fecha fin | 9/1/05 → 12/31/06 |
Huella digital
Explore los temas de investigación que se abordan en este proyecto. Estas etiquetas se generan con base en las adjudicaciones/concesiones subyacentes. Juntos, forma una huella digital única.
Proyectos
- 1 Terminado
-
Ohio River Bridges Structured Public Involvement and Support Project -- Federal Aid Research Task Number 146
Grossardt, T. (PI)
9/1/05 → 12/31/06
Proyecto: Research project