Detalles del proyecto
Description
OBJECTIVES:
PREVENTIVE MAINTENANCE PROGRAM FOR BRIDGES
KYSPR-U-424
Continuation of an Approved Study
Anticipated Completion: FY 12
I. Identi fy "Best Practices" for bridge for preventive maintenance that provide benefits by
stopping/slowing bridge deterioration along with costs and associated reductions in deterioration.
2. Determine the most cost effective means of implementing those on a large scale (e.g. state forces
or by contract).
3. Provide detailed procedures for proper field appli cation of those "Best Practices" by either state
forces or by contract.
4. Review the KYTC bridge inventOlY to determine how to implement a preventive maintenance
program could be producing the greatest beneficial impact on the entire inventory.
5. Determine KYTC actions necessary for FHWA Kentucky Division approval offund diversion
from the HBP for preventive maintenance on brid ges.
6. Develop and monitor KYTC projects employi ng experimental preventive maintenance
procedures
| Estado | Finalizado |
|---|---|
| Fecha de inicio/Fecha fin | 7/1/11 → 6/30/12 |
Financiación
- KY Transportation Cabinet
Huella digital
Explore los temas de investigación que se abordan en este proyecto. Estas etiquetas se generan con base en las adjudicaciones/concesiones subyacentes. Juntos, forma una huella digital única.
Proyectos
- 1 Terminado
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 12-32
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Fisher, J. (CoI), Goodrum, P. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Johnson, P. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Scully, T. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/11 → 6/30/12
Proyecto: Research project