Impacts of project controls on rework induced tipping point dynamics in large, complex construction projects

Producción científica: Conference contributionrevisión exhaustiva

Resumen

Large, complex construction projects such as nuclear power plants are subject to unique types of construction risks. One such unique risk is the combination of rework and increased project scope that can push a project from a period of project progress past a tipping point into a period of declining project progress. Previous research has demonstrated the potential of rework induced tipping point dynamics to cause poor cost and schedule performance on large, complex construction projects (Taylor and Ford 2006) and the effectiveness of project design strategies in mitigating tipping point risk (Taylor and Ford 2008). Previous research has also examined three project labor control policies (overtime, workforce, and work intensity) and their impact on project performance (Lyneis and Ford 2007, Ford, Lyneis, and Taylor 2007). However, the impacts of project labor controls on tipping point dynamics have not been fully investigated. The current work uses a simulation model of a construction project to investigate the ability of project labor control actions to respond to tipping point dynamics. The model demonstrates that some well intended and reasonable project labor control actions, such as the extended use of overtime, can push a project over the tipping point to failure. Project robustness to tipping point-induced failure is analyzed with sensitivity analysis. Analysis results are used to design effective project labor control responses to rework induced tipping point dynamics. Implications for practice and future research opportunities are discussed.

Idioma originalEnglish
Título de la publicación alojadaAnnual Conference of the Canadian Society for Civil Engineering 2011, CSCE 2011
Páginas1936-1945
Número de páginas10
EstadoPublished - 2011
EventoAnnual Conference of the Canadian Society for Civil Engineering 2011, CSCE 2011 - Ottawa, ON, Canada
Duración: jun 14 2011jun 17 2011

Serie de la publicación

NombreProceedings, Annual Conference - Canadian Society for Civil Engineering
Volumen3

Conference

ConferenceAnnual Conference of the Canadian Society for Civil Engineering 2011, CSCE 2011
País/TerritorioCanada
CiudadOttawa, ON
Período6/14/116/17/11

ASJC Scopus subject areas

  • General Engineering

Huella

Profundice en los temas de investigación de 'Impacts of project controls on rework induced tipping point dynamics in large, complex construction projects'. En conjunto forman una huella única.

Citar esto