Ir directamente a la navegación principal Ir directamente a la búsqueda Ir directamente al contenido principal

Performance of Two Anchored Walls Under Cut and Fill Construction Sequences

Producción científica: Article › revisión exhaustiva

Resumen

Tieback walls are typically designed using apparent earth pressures that are obtained initially by back-calculating earth pressures from measured support loads for excavation only. For construction activities involving both excavation and backfilling aspects, the use of apparent earth pressures might not be adequate. This paper investigates the performance of two tieback walls constructed using a combination of fill and cut construction sequences. Results obtained from data collected using load cells and strain gages along with the soldier piles of both walls, show the correlation of axial loads and bending moments to construction activities. Results show that some load is transferred to the soldier piles during anchor installation, despite using steel casings to prevent this action. Backfilling behind the wall created significant curvature in the soldier piles based on the measured bending moments. Moreover, results evidence that the apparent earth pressure does not reflect the observed bending moments in the walls. However, a beam model including lateral displacement is presented to represent the measured response in both walls. The results unveil differences in anchor loads estimations, evaluates the appropriateness of apparent earth pressures for the design of tieback walls and provides design recommendations.

Idioma originalEnglish
Páginas (desde-hasta)1799-1816
Número de páginas18
PublicaciónGeotechnical and Geological Engineering
Volumen38
N.º2
DOI
EstadoPublished - abr 1 2020

Nota bibliográfica

Publisher Copyright:
© 2019, Springer Nature Switzerland AG.

Financiación

The authors would like to thank Dr. Robert Liang for providing the original Sum 82 report materials and for giving insight into the installation and monitoring activities for the project. The authors would also like to thank Mr. Christopher Merklin and Mr. Stephen Taliaferro from the Office of Geotechnical Engineering at the Ohio Department of Transportation (ODOT) for providing project exploration and correspondence data that was not included in the Final Sum 82 report. These data were invaluable for performing the analyses used in this paper.

Financiadores
Office of Geotechnical Engineering
OHIO DEPARTMENT OF TRANSPORTATION

    ASJC Scopus subject areas

    • Architecture
    • Geotechnical Engineering and Engineering Geology
    • Soil Science
    • Geology

    Huella

    Profundice en los temas de investigación de 'Performance of Two Anchored Walls Under Cut and Fill Construction Sequences'. En conjunto forman una huella única.

    Citar esto